Go top
Project information

Development, application and integration of hydro simulators in the new planning environment

A. Ramos S. Cerisola J.M. Latorre

January 2004 - December 2004

Funding entity Iberdrola


In this project we have adapted and developed the analysis tools for detailed planning of hydro basin production of Iberdrola (called simulators) to the current bidding environment. Also they have been connected with the yearly economic and production planning model MPO. The project is split in the following tasks: a) Detailed time simulation of hydro production, b) Water model. Disaggregation of basin hydro production, c) Detailed hydro scheduling optimization model.


IBD-Simuladores